Malaysia - Kampar

ANDRITZ HYDRO signed a new contract in Malaysia.

The order was signed between M/s Panzana Enterprise Sdn Bhd. (PESB) and ANDRITZ HYDRO and comprises electro-mechanical works for the Kampar hydropower plant (2 x 2.5 MW). PESB is a rapidly growing company and is emerging as one of the leading Malaysian hydropower developers in the field of infrastructure and construction.

The Kampar hydropower plant is located in Sungkai Kampar, in the state of Perak Darul Ridzuan. It is a run-of-river project with a surface power house.

ANDRITZ HYDRO will supply a water-to-wire package and technical services including installation and commissioning of the supplied equipment. The project is scheduled to be completed at the beginning of 2016.

Technical data

Output:2 x 2.5 MW
Head:283.5 m
Speed:750 rpm
Runner diameter:890 mm
hy-hn28-23-eidsfoss

Next article

Norway - Eidsfoss and Vrangfoss

Read more
cover-hydronews28-en

List of all articles

Overview of the content of HYDRO News 28

Read more
Contact us
HYDRO News Editorial Office
Eibesbrunnergasse 20
1120 Vienna
Downloads
  • HYDRO News 28 PDF : 9.9 MB