Benchmark results
- Capacity boost by close to 30%
- Slightly improved outlet consistency
- Same speed range
- Adapting better to flow fluctuations
- More stable operation
In a BCTMP line, two wash presses that had reached their performance limits represented a bottleneck. Initially, only one of the screw presses was upgraded. And the results were so convincing that the same measures were implemented in screw press 2 one year later. With benchmark results …
A European pulp mill was upgrading process areas of their BCTMP line step by step to eliminate bottlenecks that were affecting plant availability. The challenge with two ANDRITZ wash presses was casual fluctuations in flow at high throughputs, pushing the screw presses to their performance limits. The customer's target was to increase production to at least 1,000 admt/d at each press compared to the current throughput of 800 - 850 admt/d – a minimum increase of 17 - 20%. Outlet consistency after the upgrade should not fall below 24% if it cannot be maintained at the same level as before. Speed range – and thus energy consumption – was also to remain unchanged.
First of all, only one ANDRITZ SCP1410 was upgraded, with the following scope:
One year later, the same measures were implemented in screw press 2.
Want to boost capacity to benchmark level?
Average values from two presses