Su Pan 1 - Vietnam

Viet Long Industry Joint Stock Company has signed a con­tract with ANDRITZ HYDRO for the supply of electro-mechanical equipment for the Su Pan 1 hydropower plant, located on the Bo River in the Vietnamese province of Lào Cai.

HPP Su Pan 1 has an underground powerhouse, which ANDRITZ HYDRO will equip with two vertical 15 MW Francis turbines, generators, gover­nors, and both main and auxiliary transformers. Additionally, the scope of supply includes a 110 kV switchyard system, 11 kV switchgear equipment, control and protection systems, inlet valve, and cooling water system, as well as auxiliary and associated se­condary equipment.

Commissioning of the project is scheduled for mid-2017.

TECHNICAL DATA

Output2×15 MW
Voltage11 kV
Head229.2 m
Speed600 rpm
Runner diameter1,038 m
Lake

Next article

Hatillo - Dominican Republic

Read more
city scape and network connection_iStock-620974266

List of all articles

All content of HYDRO News 30

Read more
Contact us
HYDRO News Editorial Office
Eibesbrunnergasse 20
1120 Vienna
Downloads
  • Read article as PDF PDF : 127 KB